Santa Cruz County is interested in bids with site layout for an ages 5-12 universally accessible playground to create an area with elements that stimulate and encourage involvement for all ages and abilities that meets the American Society of Landscape Architects’ Professional Practice features of universally designed playgrounds. The proposed new structures will provide universally accessible and ADA compliant recreation opportunities.
Pre-Bid Meeting
7/6/2026
451 North Arroyo Blvd., Nogales, AZ
The scope of work in total includes the construction of approximately 9,330 square feet of concrete sidewalk along High School Avenue and 2nd Street in Thatcher, Arizona. The project includes some curbing, sidewalk ramps and driveway tie-ins. The Town will provide in-house engineering and construction staking for the project.
4/1/2026
3700 W. Main St., Thatcher, AZ 85552
Bid Opening
4/6/2026
808 S 7th Ave, Safford, AZ 85546
The Project includes the following Work: Equipping of new well, including supporting facilities consisting of the following: new pump and motor, discharge piping manifold, pump to waste piping and discharge structure, site piping and tie-in to distribution system, gaseous chlorination system, fencing, and electrical, instrumentation and controls. This project will use WIFA funding. Selected contractor shall abide by all requirements with respect to the attached WIFA Contract Package, that includes but is not limited to American Iron and Steel Requirements, Davis-Bacon Wage Requirements, Compliance with Civil Rights Act and Equal Opportunity, Prohibition of Certain Telecommunication and Video Surveillance Services or Equipment and Signage Requirements.
Graham County Fairgrounds: This project will involve approximately 18,744 square feet of new concrete sidewalks and access aisles. Additionally, pedestrian pathways around the fairgrounds will be modified to meet ADA accessibility standards. Graham County staff engineers will complete all design work in house, and a competitively-procured contractor will perform all construction.
4/7/2026
921 W Thatcher Blvd, Safford AZ
5/4/2026